Lange Marktstraat 24-26








The challenge
Several interlinked buildings at a prominent location in Leeuwarden’s business district are empty for some time. Requests for this many square metres do not come along every day, an important factor in the owner’s lack of success in attracting new tenants. News that a major tenant is looking for approximately 10,000 m2 of office space in the city’s business district seems to provide the perfect opportunity to bring the empty buildings into the spotlight.The approach
Anticipating the prospective tenant’s requirements, CBRE worked with the owner to come up with a customised solution designed to convince the tenant to opt for this property. The core of this solution was to merge two separate buildings into a single property large enough to offer the required floor space to a single tenant. In line with this solution, a renovation plan was drawn up.The project
In the initiatory phase, CBRE advised the owner on the renovation plan and the spatial and functional modifications to the building. CBRE then comprehensively oversaw negotiations with the tenant. A cooperation agreement with the tenant was also signed for the design and project management during implementation.
The following modifications were made:
- Two buildings were combined architecturally and in terms of technical installations, to create a single perimeter block.
- Central facilities and a meeting place were located in the atrium, accessed through two new double-height entrances. A staircase and a platform connect the atrium with the fully renovated office floors.
- Efficient sustainability improvement and upgrading of air conditioning systems. On completion, the building had a first-rate energy label (A) and climate class B.
- During the project, tenant and owner reached an agreement on replacing the entire façade of the building and improving its sustainability. This additional aspect was incorporated without having to extend the planning schedule.
Results
The tenant and the owner eventually signed a 12-year lease for 12,000 m2
LFA. Efficient cooperation between both project teams enabled this extensive renovation to be carried out within a highly ambitious schedule. The result is a building that once again meets the latest requirements in terms not only of indoor climate and sustainability performance, but also of functional spatial layout.
The challenge
Several interlinked buildings at a prominent location in Leeuwarden’s business district are empty for some time. Requests for this many square metres do not come along every day, an important factor in the owner’s lack of success in attracting new tenants. News that a major tenant is looking for approximately 10,000 m2 of office space in the city’s business district seems to provide the perfect opportunity to bring the empty buildings into the spotlight.The approach
Anticipating the prospective tenant’s requirements, CBRE worked with the owner to come up with a customised solution designed to convince the tenant to opt for this property. The core of this solution was to merge two separate buildings into a single property large enough to offer the required floor space to a single tenant. In line with this solution, a renovation plan was drawn up.The project
In the initiatory phase, CBRE advised the owner on the renovation plan and the spatial and functional modifications to the building. CBRE then comprehensively oversaw negotiations with the tenant. A cooperation agreement with the tenant was also signed for the design and project management during implementation.
The following modifications were made:
- Two buildings were combined architecturally and in terms of technical installations, to create a single perimeter block.
- Central facilities and a meeting place were located in the atrium, accessed through two new double-height entrances. A staircase and a platform connect the atrium with the fully renovated office floors.
- Efficient sustainability improvement and upgrading of air conditioning systems. On completion, the building had a first-rate energy label (A) and climate class B.
- During the project, tenant and owner reached an agreement on replacing the entire façade of the building and improving its sustainability. This additional aspect was incorporated without having to extend the planning schedule.
Results
The tenant and the owner eventually signed a 12-year lease for 12,000 m2LFA. Efficient cooperation between both project teams enabled this extensive renovation to be carried out within a highly ambitious schedule. The result is a building that once again meets the latest requirements in terms not only of indoor climate and sustainability performance, but also of functional spatial layout.
Related Services
Design and commission all aspects of your building, including systems, envelope and structure using the latest facilities best practices.
Accelerate your journey to net-zero, improve the resilience and reliability of your real estate and reduce the total cost of ownership of your portfolio.
Deliver projects seamlessly with an integrated team that manages everything from schedules and budgets to the entire construction process.
Related case studies
-
Case Study
Hybrid working in a future-proof Tower Ten
In response to the pandemic and their changing organizational model, the real estate investor is curious about a completely new way of working. One that is future-proof.
-
Case Study
APG back home in brand new office
APG recently moved back into EDGE Amsterdam West – the same building the pension administrator had previously occupied for years, but has now been completely redeveloped.
-
Case Study
Schneider Electric is living proof: relocating is not always the most sustainable solution
Sometimes the perfect solution is so close that you need a fresh perspective to see it. That’s exactly what happened to Schneider Electric, who were looking for a more sustainable head office in the Netherlands.